SWCC Shuqaiq Phase 2 — Piping & Pump Station Mechanical Works

Location: Shuqaiq, Saudi ArabiaPeriod: Under Mipe Co.Client: Saline Water Conversion Corporation (SWCC)Role: Krishna Uppala — Site Manager

Scope

Piping and spool fabrication, pump-station mechanical works, compressor room and valve station installation, spool/pantaloon fabrication at a purpose-built site workshop.

Technical Details

  • Total piping scope: 400,000 dia-inch
  • 2,000 m² spool shop built and equipped for the project
  • Reported at 96% scope completion within a two-year programme
  • Full pump-station mechanical installation and SS spool/skid works
Aerial view of dome-roofed storage tanks at the SWCC Shuqaiq coastal site
Storage tank exterior at the SWCC Shuqaiq project with workers on the top rail walkway
Steel pipe spool being installed in a trench near a storage tank with SWCC signage
Pump station equipment room with motor-driven pumps, piping and gauges

This project represents prior professional experience of members of STECOO's engineering and leadership team before the incorporation of STECOO Steeltech Engineering & Construction Operations LLP on 29 June 2023.